Dunboyne
The existing track was shale and had been previously been tarmacked in preparation for the final surfacing.
The club put funding in place to upgrade to a synthetic surface for the 5500m² track.
In 2019 CONIPUR SP was chosen in red and the installation was completed by the summer of 2019.
CONIPUR SP
Water permeable spray coated athletics track system
13mm thick polyurethane track system, with a PUR-bound elastic layer based on recycled granules and a 3mm PUR spray coating as a top layer
Features:
- Ultra cost effective
- Water permeable
- Seamless and spike resistant
- Wide range of colours
- Fully tested to EN14877
- World Athletics certified