Case Studies
What type of Case Study are you looking for?
Case Study
Dunboyne
The existing track was shale and had been previously been tarmacked in preparation for the final surfacing. The club put funding in place to upgrade to a synthetic surface for the 5500m² track. In 2019 CONIPUR SP was chosen in …
read case studydownload pdfCase Study
Bourne Grammar School
As part of ongoing improvement works at the Lincolnshire school CONICA was selected to provide the new long jump surface it’s the start of a programme to improve the schools sporting facilities over the next few years. The long jump …
read case studydownload pdfCase Study
Medical Cannabis factory
In Denmark, Europe’s largest production space of medical cannabis is emerging. In cooperation with our partner JTI Gulventreprise a/s, the greenhouses will be equipped with CONIFLOOR IPS industrial floor. The project started with an area of 6,000 m² in an existing greenhouse, …
read case studydownload pdfCase Study
St Brigid’s Athletics Club
St Brigid’s Athletics Club recently completed upgrades to it’s facilities in Oldcastle, County Meath, Ireland. The development works included a 120m six lane sprint track and 35m single lane long jump run up, both surfaced using CONICA’s CONIPUR SP. CONICA’s …
read case studydownload pdfCase Study
Ratoath Sprint Track
Ratoath Athletics Club in Ireland has recently expanded its facilities as part of a wider development at the site which included a new artificial turf pitch and extra tennis court. The club had an existing 6 lane 400m natural grass …
read case studydownload pdfCase Study
Croydon Youth Zone
Croydon Youth Zone has been named by young people in the area as Legacy it’s a purpose built facility for the borough’s young people. The infrastructure of the facilities is based on Onside Youth Zones 21st century model and includes …
read case studydownload pdfCase Study
Merryfield School, Newcastle
Working on behalf of Pentagon Play, playground design and installation specialist, Let’s Play Everywhere, completed this stunning project at Merryfield School in Newcastle. The 350m²playground had become out dated and the school wanted to create a more vibrant and fun …
read case studydownload pdfCase Study
Ballykelly Multi Use Games Area
CONICA installation partner Sports Ground Specialists NI completed this multi-use games area (MUGA) on behalf of Hawthorn Heights in Ballykelly, Northern Ireland. Causeway Coast and Glens Borough Council supported the construction of the project to provide the local community with …
read case studydownload pdfCase Study
Whitley Bay
The 4500m² six-lane 400 metre athletics track owned by North Tyneside Council was recently resurfaced using CONICA’s CONIPUR SP high performance track finish to bring the facility into line with new competition standards introduced by UK Athletics in 2019. The …
read case studydownload pdfCase Study
Middlesborough FC Training Ground
The works included extending and resurfacing the existing 3G pitch and installing a new 260m² footpath. CONIPAVE yellow was used for the footpath, this system uses SBR rubber granules and aggregate mixed with CONIPAVE 610 binder. The new path leads …
read case studydownload pdfCase Study
Erewash Golf Course
Erewash Valley golf club were looking to improve their facilities in the summer of 2018. One of the main issues Golf Clubs face is the heavy wear of areas between the tees and the greens. CONICA were asked to offer …
read case studydownload pdfCase Study
Footes Lane, Guernsey
This facility in Guernsey needed improvements ready for when it shall host the Island Games in 2021. The event will see around 3,000 competitors from 24 islands around the world take part. Completed in September 2019, the main task was …
read case studydownload pdfCase Study
Chester Racecourse
As part of the continuing development of the famous Chester Racecourse facility CONICA was selected to provide the materials for the new improved parade ring on the site. More viewing areas have been created in the infield to enhance the …
read case studydownload pdfCase Study
Institute of Technology, Carlow
CONICA partner and sports surfacing specialist, Tony Patterson Sportsgrounds, completed the installation of the athletics track at The Institute of Technology Carlow. This challenging installation took almost 1 year to complete following major delays resulting from bad weather and Covid-19. …
read case studydownload pdfCase Study
St Joseph’s Primary School, Barnoldswick
Playground design and build specialists, Let’s Play Everywhere, installed this outdoor fitness area for the students at St. Joseph’s Primary School in Barnoldswick. CONIPAVE RA was chosen to surround the new equipment, providing added comfort and safety for the children …
read case studydownload pdfCase Study
Tonbridge School
Tonbridge school embarked on a programme of sports facilities improvements in 2018 which included the resurfacing of a hockey pitch carpet and shock pad and the re topping of the existing Athletics running track. The surface was re-topped using CONICA’S …
read case studydownload pdfCase Study
Basildon Athletics Track
The existing facility dates back to 1969 when Basildon Athletics Club first used the original grass track. This was then developed into a tartan track in 1986, which underwent a retexturizing process in 2005 to extend its lifespan. Basildon Council …
read case studydownload pdfCase Study
Co-op Academy Middleton
As part of an £18 million pound extension to the main building, the Academy’s sports facilities also received improvements. The existing sports hall spanning 625m² received new CONICA sports flooring. CONIPUR HG Eco 6+2mm point elastic was chosen for this …
read case studydownload pdfCase Study
Oundle School
As part of the Schools ongoing Sports Masterplan the athletics track was relocated to a prominent new location to allow the current track site to become the home of the new sports centre. Oundle school needed a suitable surface for …
read case studydownload pdfCase Study
Ashbourne Linear Park
Ashbourne Linear Park in Ireland had it’s grand opening last week following work to make a brand new upgraded playground. The new multi-age play are is for toddlers, young and older children and has an amphi-theatre and mural wall, new …
read case studydownload pdfCase Study
Crawfordsburn Play Area
Playground surfacing and equipment installation specialist, Garden Escapes, completed this stunning project at a local play area by the Glen Nature Reserve in Crawfordsburn, Northern Ireland. The existing playground had become very out dated and whilst other landscaping works were …
read case studydownload pdfCase Study
Moor Allerton Primary School
The new 700m² multi-use games area (MUGA) was constructed at the school in Leeds by installer Nova Sport using CONIPUR SP Sky Blue polymeric system for the surface. The project was part of a large £5.6m refurbishment of the school …
read case studydownload pdfCase Study
Heydon Bridge High School
Two new multi-use games areas (MUGAs) were constructed at the Heydon Bridge high school by Cleveland Land Services in May 2020. Finished with the Conipur SP Green polymeric system, the project was part of a large £4.5m refurbishment of the …
read case studydownload pdfCase Study
Bolton College
Bolton College recently improved their sports hall by installing a new CONIPUR AE eco surface and LED lighting as part of ongoing improvements at the College. Recreational coatings were awarded the contract and removed the existing vinyl sprung floor, this was …
read case studydownload pdfCase Study
Barnet Youth Zone
Barnet Youth Zone has been named by young people in the area as Unitas it’s a purpose built facility for the borough’s young people. The infrastructure of the facilities is based on Onside Youth Zones 21st century model and includes …
read case studydownload pdfCase Study
Oxford University
The resurfacing of four outdoor tennis courts was part of a 60 million pound project to redevelop the Oxford Iffley road sports centre site. The university wanted to upgrade the existing tarmacadam courts they offer on the site after extensive …
read case studydownload pdfCase Study
Huddersfield’s Canal Path
In recent years, the Canal & River Trust has helped to re-invigorate many sections of canal towpath and prevent muddy and water logged sections. As part of the on‐going regeneration of Canal pathways, the Canal River Trust specified CONIPAVE RA …
read case studydownload pdfCase Study
Belfast Academy
CONICA HG Re-top offers a cost-efficient and technically simple solution for the refurbishment of PUR coatings in sports halls. This CONICA technology is based on many years of experience of a range of surface types in a variety of sports …
read case studydownload pdfCase Study
White Collar Factory Roof Top
290m² of red EPDM was installed to create a running track on top of a 17 story-high office block in central London. Confidence that the surfacing was able to withstand strong winds and the heat and UV exposure from the …
read case studydownload pdfCase Study
Bingham Athletics Track
As part of a long term improvement programme at Bingham Leisure Centre the council included the full refurbishment of the 8 lane 5135m² athletics track using CONIPUR SP re-topping system. Stage one was a full clean of the track, paramount …
read case studydownload pdfCase Study
Chorley’s Westway Sports Hub
Chorley’s Westway Sports Hub benefitted from a large development program. Supported and part funded by the Premier League, The FA and government’s Football Foundation, the sports centre now has its own full size football pitch, athletics track, pavilion, changing facilities …
read case studydownload pdfCase Study
Hartpury College
The new £8.8 million Sports Academy club’s training centre opened in Autumn 2018. The college has produced hundreds of international sportsmen and women over the past decade this facility will enhance their experience and raise the bar with the college …
read case studydownload pdfCase Study
Antrim Lough Shore Play Park
The new 800m² playground was funded by Antrim and Newtownabbey council to a cost of £250,000. Some elements of the new play park have been designed by school pupils from across the local area. The play area will make the …
read case studydownload pdf